Leasehold Capital Expenditure Economy Mid-Range Premium
(RM/PSF) (RM/PSF) (RM/PSF)
GRAND TOTAL 100 120 150
Fixtures & Fittings and Finishes 35 37 43
Carpets / Floor finishes 7.5 8 9
Wall Finishes 4.5 5 7
Ceiling Finishes 4.5 5 6
Partitions (glass/gypsumboard) 10.5 11 11
Doors, frames and iron mongery 8 8 10
Furniture 30 45 66
Custom and loose furniture
Filing and storage cabinets
Conference table and presentation cabinets
Pantry and equipment cabinets
M & E Services 28 30 32
Electrical Works & Networking
Fire Protection System
Air-conditioning Works
Miscellaneous 7 8 9
Signage
Plumbing Works
Plantings / Graphics / Blinds
General Services SUBJECT TO LOCAL AUTHORITY (EXCLUDED)
Insurance and preliminaries
Consultancy fees: Architect / M&E / Structural
Grand Total 100 120 150